Bathroom costs depend on size, suite specification, tiling coverage and whether layout changes are required. This guide reflects typical fully managed bathroom projects including strip-out, plumbing, tanking, tiling and decoration.
Investment ranges by project type
£6,500 – £9,500
Like-for-like replacement with mid-range suite, tiling to wet areas and standard decoration.
- Strip-out & waste removal
- First & second fix plumbing
- Tanking & tiling
- Electrical fan & lighting
- Decoration
£9,500 – £14,000
New suite, full wall tiling, improved lighting and premium brassware.
- Layout optimisation
- Full wall tiling
- Underfloor heating option
- Premium suite & brassware
- Part P certification
£14,000 – £22,000+
Walk-in showers, wet rooms or layout changes with waste rerouting.
- Waste rerouting if required
- Walk-in shower or wet room
- Bespoke tiling design
- Underfloor heating
- Full documentation
What affects your price
Suite specification
Trade-supplier mid-range vs designer suites significantly affects total cost.
Tiling coverage
Full-height wall tiling costs more than wet-area-only tiling.
Layout changes
Moving waste positions or converting baths to showers adds plumbing complexity.
Access & property type
Upper-floor bathrooms and limited parking can extend programme length.
Compare like for like: Ensure quotations include tanking, waste removal, making good and Part P certification, not just suite supply and fit.
Price guide FAQs
How long does a bathroom take?
A standard bathroom typically takes 7–10 working days. Layout changes may take 2–3 weeks.
Can you supply the suite?
Yes. We supply from trade suppliers at competitive prices or install customer-supplied items after suitability checks.
Do you guarantee against leaks?
All plumbing and tiling work is guaranteed. We tank wet areas and test installations before handover.