Garage Conversion Cost Guide

Realistic UK investment ranges for integral and detached garage conversions, updated for 2025–2026.

Garage conversions are one of the most cost-effective ways to add living space. This guide covers typical fully managed projects across Milton Keynes, Northampton, Bedford and surrounding areas, including damp proofing, insulation, electrics, plastering and Building Control.

Typical build cost per m²

£850 – £1,200

Per square metre guide for a standard garage conversion shell with mid-range finishes, before shower rooms or kitchenettes.

Investment ranges by project type

Integral Garage (Standard)

15–18m²

£9,500 – £14,000

Attached garage converted to living space with insulation, electrics, plastering, decoration and Building Control sign-off.

  • Damp proofing & insulation
  • New window or door if required
  • Electrical installation
  • Plastering & decoration
  • Building Control throughout

Integral with Shower Room

15–20m²

£12,000 – £17,500

Bedroom or office with en-suite shower room, including plumbing first and second fix.

  • All standard conversion works
  • Shower room plumbing & tiling
  • Extractor and waterproofing
  • Electrical certification

Detached Garage

18–25m²

£14,000 – £22,000

Separate structure with additional services run from the main house. Popular for annex and gym use.

  • Extended service runs
  • External door and window
  • Full thermal upgrade
  • Consumer unit upgrade if required

Optional extras

Shower room / bathroom £2,000 – £2,800
Kitchenette £2,500 – £3,200
Steel beam (if required) £1,800 – £3,500
Premium LVT flooring £600 – £900
External wall insulation £1,500 – £2,200

What affects your price

Garage type

Detached garages often need longer service runs and more extensive thermal upgrades.

Floor level

Garage slabs below house floor level require careful damp proofing and insulation design.

Existing structure

Steel beams, lintels and opening sizes affect structural costs.

Specification

Shower rooms, kitchenettes and premium finishes increase investment proportionally.

Compare like for like: Compare quotations on what's included: Building Control, insulation standards, electrics and decoration should all be in scope.

Price guide FAQs

Do I need planning permission?

Most garage conversions are Permitted Development if the footprint does not increase. We verify at survey.

How long does it take?

Typically 4–6 weeks for a standard integral conversion, depending on specification.

Will I lose parking?

The internal space converts to living area. We discuss partial conversions and layout at survey if parking matters.

Get In Touch

Ready to start your project?

Book a free property survey. We will assess your requirements, provide transparent pricing, and explain how our system works.

Call 01908 015687