Traditional Lead Valley Installation

· 1 day

Background

Starting point

The customer required traditional Lead Valley Installation at the property in the local area. The aim was to complete the work to a high standard, coordinate the relevant trades and leave a clean, durable finished result.

Existing condition

The existing area was assessed before work began to confirm access, condition, interfaces with surrounding construction and the most suitable sequence for the traditional lead valley installation. No additional survey details are recorded for this historic project.

Challenges

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

Photography

Delivery

What we did

  1. Completed a traditional lead valley installation.

Programme

Work stages

Access & inspection

Set up safe access and inspect the existing masonry/roof detail to confirm the areas requiring renewal. QC focus: preparation, correct sequencing and quality of the access & inspection stage.

Removal & preparation

Remove defective mortar, leadwork or surrounding covering as necessary and clean the surfaces ready for the new detail. QC focus: preparation, correct sequencing and quality of the removal & preparation stage.

Installation / repair

Form and install the new lead, mortar, valley or ridge detail using the appropriate method for the existing roof. QC focus: preparation, correct sequencing and quality of the installation / repair stage.

Finishing

Point/seal/patinate or reinstate adjoining roof materials as required. QC focus: preparation, correct sequencing and quality of the finishing stage.

Completion check

Inspect the finished weathering detail and photograph the completed work. QC focus: preparation, correct sequencing and quality of the completion check stage.

Specification

Products & materials

Lead sheet

Selected for durable traditional weathering at roof junctions, abutments, valleys, chimneys or outlets.

On site

Problems solved

Issue

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

How we fixed it

Quality Construction recommended a targeted, properly prepared installation rather than a temporary cosmetic repair. The agreed approach was to completed a traditional lead valley installation. with attention to preparation, detailing and long-term performance.

Outcome

A clean traditional lead drainage/weathering detail was formed within the roof.

Outcome

The result

A clean traditional lead drainage/weathering detail was formed within the roof.

Planning a similar project?

Book a free survey

Tell us about your property and we will explain how our system works for a project like this.