New Leadwork Replacement on Newly Renewed Roof – Milton Keynes Village
A Quality Construction project in Milton Keynes Village: New Leadwork Replacement on Newly Renewed Roof – Milton Keynes Village. The new roof received a much cleaner, premium lead finish.
Background
Starting point
The customer wanted a reliable, properly finished solution at the property in Milton Keynes Village. The starting point was existing leadwork looked very poor and had been coated/blackened. The priority was to correct the issue properly and leave a durable, professional finish.
Existing condition
Existing leadwork looked very poor and had been coated/blackened. The existing construction and surrounding details were assessed so the scope could focus on the areas genuinely requiring attention.
Challenges
The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.
Photography
Before
Completed
Delivery
What we did
- Removed the unattractive existing lead and installed clean new leadwork onto the newly renewed roof.
Programme
Work stages
Access & inspection
Set up safe access and inspect the existing masonry/roof detail to confirm the areas requiring renewal. QC focus: preparation, correct sequencing and quality of the access & inspection stage.
Removal & preparation
Remove defective mortar, leadwork or surrounding covering as necessary and clean the surfaces ready for the new detail. QC focus: preparation, correct sequencing and quality of the removal & preparation stage.
Installation / repair
Form and install the new lead, mortar, valley or ridge detail using the appropriate method for the existing roof. QC focus: preparation, correct sequencing and quality of the installation / repair stage.
Finishing
Point/seal/patinate or reinstate adjoining roof materials as required. QC focus: preparation, correct sequencing and quality of the finishing stage.
Completion check
Inspect the finished weathering detail and photograph the completed work. QC focus: preparation, correct sequencing and quality of the completion check stage.
Specification
Products & materials
Lead sheet
Selected for durable traditional weathering at roof junctions, abutments, valleys, chimneys or outlets.
On site
Problems solved
Issue
The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.
How we fixed it
Quality Construction recommended a targeted, properly prepared installation rather than a temporary cosmetic repair. The agreed approach was to removed the unattractive existing lead and installed clean new leadwork onto the newly renewed roof. with attention to preparation, detailing and long-term performance.
Outcome
The new roof received a much cleaner, premium lead finish.
Outcome
The result
The new roof received a much cleaner, premium lead finish.