Background

Starting point

The customer wanted a reliable, properly finished solution at the property in Milton Keynes Village. The starting point was existing leadwork looked very poor and had been coated/blackened. The priority was to correct the issue properly and leave a durable, professional finish.

Existing condition

Existing leadwork looked very poor and had been coated/blackened. The existing construction and surrounding details were assessed so the scope could focus on the areas genuinely requiring attention.

Challenges

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

Photography

Delivery

What we did

  1. Removed the unattractive existing lead and installed clean new leadwork onto the newly renewed roof.

Programme

Work stages

Access & inspection

Set up safe access and inspect the existing masonry/roof detail to confirm the areas requiring renewal. QC focus: preparation, correct sequencing and quality of the access & inspection stage.

Removal & preparation

Remove defective mortar, leadwork or surrounding covering as necessary and clean the surfaces ready for the new detail. QC focus: preparation, correct sequencing and quality of the removal & preparation stage.

Installation / repair

Form and install the new lead, mortar, valley or ridge detail using the appropriate method for the existing roof. QC focus: preparation, correct sequencing and quality of the installation / repair stage.

Finishing

Point/seal/patinate or reinstate adjoining roof materials as required. QC focus: preparation, correct sequencing and quality of the finishing stage.

Completion check

Inspect the finished weathering detail and photograph the completed work. QC focus: preparation, correct sequencing and quality of the completion check stage.

Specification

Products & materials

Lead sheet

Selected for durable traditional weathering at roof junctions, abutments, valleys, chimneys or outlets.

On site

Problems solved

Issue

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

How we fixed it

Quality Construction recommended a targeted, properly prepared installation rather than a temporary cosmetic repair. The agreed approach was to removed the unattractive existing lead and installed clean new leadwork onto the newly renewed roof. with attention to preparation, detailing and long-term performance.

Outcome

The new roof received a much cleaner, premium lead finish.

Outcome

The result

The new roof received a much cleaner, premium lead finish.

Planning a similar project?

Book a free survey