Pitch-to-Flat Roof Junction Lead & Felt Repair – Wolverton

Wolverton, Milton Keynes · Half a day

A Quality Construction project in Wolverton: Pitch-to-Flat Roof Junction Lead & Felt Repair – Wolverton. The vulnerable pitch-to-flat junction was properly closed and weathered.

Background

Starting point

The customer wanted a reliable, properly finished solution at the property in Wolverton. The starting point was large gap where the flat roof met the pitched roof. The priority was to correct the issue properly and leave a durable, professional finish.

Existing condition

Large gap where the flat roof met the pitched roof. The existing construction and surrounding details were assessed so the scope could focus on the areas genuinely requiring attention.

Challenges

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

Photography

Delivery

What we did

  1. Installed a new lead detail at the junction and integrated/sealed it with the mineral-felt roof covering.

Programme

Work stages

Inspection & preparation

Assess the existing substrate or prepared deck, remove failed material where required and clean the area thoroughly. QC focus: preparation, correct sequencing and quality of the inspection & preparation stage.

Repairs / build-up

Complete any structural, deck, DPM, insulation or upstand work required before waterproofing. QC focus: preparation, correct sequencing and quality of the repairs / build-up stage.

Waterproofing installation

Install the specified EPDM, single-ply or liquid-applied waterproofing system with careful detailing around edges, outlets and penetrations. QC focus: preparation, correct sequencing and quality of the waterproofing installation stage.

Trims & interfaces

Complete perimeter trims, wall details, fascias, gutters or adjoining roof interfaces. QC focus: preparation, correct sequencing and quality of the trims & interfaces stage.

Final inspection

Check continuity, laps/details and the finished appearance, then photograph and leave the area clean. QC focus: preparation, correct sequencing and quality of the final inspection stage.

Specification

Products & materials

Lead sheet

Selected for durable traditional weathering at roof junctions, abutments, valleys, chimneys or outlets.

On site

Problems solved

Issue

The main consideration was integrating the new work correctly with the existing property while maintaining weathering, finish and build quality. No unusual additional challenge is recorded for this historic project.

How we fixed it

Quality Construction recommended a targeted, properly prepared installation rather than a temporary cosmetic repair. The agreed approach was to installed a new lead detail at the junction and integrated/sealed it with the mineral-felt roof covering. with attention to preparation, detailing and long-term performance.

Outcome

The vulnerable pitch-to-flat junction was properly closed and weathered.

Standards

Planning, quality & handover

Quality control

Quality checks focused on preparation, alignment, weathering/detailing, fixings and the finished appearance relevant to this pitch-to-flat roof junction lead & felt repair – wolverton. Photographs should be used to evidence visible and hidden-stage workmanship where available.

Project management

The works were organised around a planned sequence and completed over Half a day. Materials, access and individual work stages were coordinated so the project could progress efficiently with minimal unnecessary disruption.

Outcome

The result

The vulnerable pitch-to-flat junction was properly closed and weathered.

Planning a similar project?

Book a free survey

Tell us about your property and we will explain how our system works for a project like this.